YouTube/ Screengrab from LTA singapore
Photo: YouTube/ Screengrab from LTA singapore
Look forward to more reliable MRT train rides from 2025 onwards
SINGAPORE: Singapore, with its bustling population of over three million daily MRT commuters, is gearing up for a significant upgrade in its rail system. Singaporeans should look forward to more reliable MRT train rides from 2025 onwards with the upcoming Singapore Rail Testing Centre (SRTC), set to be fully operational in 2025.
On Friday, Nov 24 the Land Transport Authority (LTA) shared updates on the new Singapore Rail Testing Centre on their latest issue on CONNECT and on their Facebook page. The driving force behind the SRTC is the need for enhanced maintenance and testing protocols as the 260km rail network continues to expand. The current challenge is the limited time window for testing, given that trains run from 5.30 am to almost midnight. Additionally, the evaluation of new train models, often tested overseas, can take several years before reaching Singapore. The SRTC is poised to revolutionize this landscape.
One of the key advantages of the SRTC is its ability to conduct train testing around the clock, replicating actual operational conditions. This is made possible by dedicated tracks that mimic passenger lines, allowing for more comprehensive testing away from main routes at any time of the day.
The facility, located in Tuas, has three purpose-built tracks.
- An uphill gradient for testing train endurance.
- An "S-shaped" track for performance and integration assessments.
- A straight high-speed track for speeds up to 100 km/h.
Newsletter
Get updates straight to your inbox